
Spraying Polyurea Paint for Concrete Substrate Material Th
Spraying polyurea paint for concrete substrate material TH-501H /Spray Polyurea Elastomer Coating SPUA for Anticorrosion;
Basic Info.
| Model NO. | TH50 series |
| Material | Acrylic |
| Appearance | Liquid |
| Main Raw Material | Polyurethane |
| Method | Spray |
| Level | Finish Coat |
| Components | Film Forming Matter |
| Formation Mechanism | Conversion Type |
| Formula | R-Nh-Co-CH-R` |
| Einecs | 0 |
| CAS No. | 0 |
| Substrate | No Limit |
| Drying Method | Chemical Merchanism Drying |
| Type | Roofing and Waterproofing |
| Ceiling Tile Shape | Liquid |
| Thickness | 2.0mm |
| Ceiling Tile Type | Metal Ceilings |
| Surface Treatment | Spray Painted |
| Function | Anti-static, Fireproof, Heat Insulation, Sound-Absorbing, Waterproof |
| Usage | Outdoor, Indoor |
| After-sales Service | on-Line Service |
| Transport Package | Pallet |
| Specification | Component A: 18KG/bucket Component B: 12KG/bucke |
| Trademark | 0 |
| Origin | China |
| HS Code | 3911900003 |
| Production Capacity | 8000t/Year |
Product Description
Spraying polyurea paint for concrete substrate material TH-501H /Spray Polyurea Elastomer Coating SPUA for Anticorrosion and waterproof protection of construction, chemicals, transportation, metallurgy,electric power, aerospace, marine, shipbuilding and other fields.Company Information
Spraying polyurea paint for concrete substrate material TH-501H/Base polyurea for metal substrate-general primer TH-501G
Construction and Project case
Packaging and Shipping
FAQ
1. What is the price for polyurea materials?
The price is decided by Quantity .
2. How about samples?
Sample Lead Time: 5 working days Sample Fee: 1).It's free for all for a regular customer
2).For new customers, we will charge first, it is fully refundable when order confirmed.
3. How many days for shipping?
Shipping Methods and Lead Time:
By Express: 3-5 working days to your door (DHL, UPS, TNT, FedEx...)
By Air: 5-8 working days to your airport
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference. Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days)
4. What is the Terms of Payment?
Credit Card,T/T, L/C, Western Union; 30% T/T in advance, 70% before delivery.5. Packaging & Shipping ? Pallet, wooden case or with outer carton, or as customers' specific requirements.
6. Why choose your company?
We are focusing on all aspects of anticorrosive waterproof, insulation fields. US technology and made in China, high quality and nice prices.
We strictly implement the rules according to the quality standard in every aspects from the purchase of raw material to the production process and outgoing of products.
Great service and Superior quality is provided all the time…
Packaging & Shipping Packing: Carton, wooden box and pallet, or as customers' requirements.
Shipping: By Express (DHL /UPS /TNT /FedEx /EMS), By Air, By Sea

| Item | Technical Index | ||
| HG/T 4566-2013 (metal substrate-general primer) | TH-501G | ||
| Non-volatile content (%) | ≥55 | 56 | |
| Drying time (h) | Surface drying time | ≤4 | 1 |
| Hard working time | ≤24 | 8 | |
| Appearance of coating film | normal | normal | |
| Bending test (mm) | 2 | qualified | |
| Impact resistance (cm) | 50 | qualified | |
| Cross-cut test (spacing 1mm)/level 1 | 1 | qualified | |
| (immersed in 3% NaCl solution for 168h) | No abnormality | No abnormality | |
| Salt spray resistance (120h) | One-way corrosion of 2.0mm at the marked area, no blistering, rust, cracking, peeling, etc. in the unmarked area. | Qualified | |
| The versatility of spray polyurea products |
| Product shelf life and storage: 1. The storage temperature should be 5-40ºC2. Under normal storage and transportation conditions, the storage period is not less than 6 months from the date of production 3. Store in a cool, ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions 4. Packaging: component A: 220KG/drum, component B: 210KG/drum |
| Precautions: 1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature; 2. Before the product is used, component B should be fully stirred; 3. The system has a 100% solid content, and it is strictly forbidden to add any diluent; 4. During construction in a confined space, good ventilation must be maintained; 5. When using this product, you must wear work clothes, goggles, gas masks, gloves and other protective equipment. |
| Product application guidance: Recommended spraying machine: Graco H-XP3 polyurea spraying equipment spray gun; air or mechanical self-cleaning polyurea spray gun Static pressure 2300-2500psi; dynamic pressure 2000-2200psi Recommended dry film thickness: 1000-3000μm Recoating interval≤6h |
| Proportion: Component A: Component B =1:1 |
You may also like
Send inquiry
Send now
